Quality Assurance

Quality is planned, not inspected in at the end. ASTERON defines the quality requirements for each project and verifies them throughout manufacture.

01 — Scope

What we do

The inspection and test plan lists every check: incoming components, in-process inspections, routine tests and final acceptance — each with its acceptance criteria and required record.

Where something does not conform, it is recorded, corrected and re-verified before the equipment moves on.

02 — Process

How it runs

  1. Define

    We set the quality requirements and acceptance criteria.

  2. Plan

    We agree the inspection and test plan with the manufacturer.

  3. Verify

    We carry out and witness inspections and tests.

  4. Record

    We compile the quality records for handover.

Deliverables

What you receive

  • Project quality plan
  • Inspection and test plan with acceptance criteria
  • Inspection and test records
  • Non-conformance and corrective action records

When it applies

When you need this

  • Your project requires documented quality control
  • Your client or insurer requires inspection records
  • You are sourcing critical equipment

03 — Related

Continue exploring

Manufacturing & Quality

Factory Inspection

Physical inspection of equipment at the manufacturer — components, workmanship, wiring and conformity to drawings.

Engineering

Production Oversight

Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.

Manufacturing & Quality

Factory Acceptance Testing

Formal, witnessed testing of equipment against the specification before it is released for shipment.

Start with your load

Tell us about your load. We’ll engineer the system.

Share what you know about your project — even if some of it is still undecided. Our engineers review every inquiry.

No price lists. Every proposal is engineered to your project.