Production Oversight
Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.
MFQ-02
Each order follows a defined path through production. ASTERON agrees that path with the manufacturing partner in advance and tracks the equipment along it.
01 — Scope
Production begins only after manufacturing drawings are reviewed against the specification. Fabrication, assembly, wiring and finishing then proceed with inspections at agreed points, followed by testing and preparation for shipment.
The sequence is recorded in the inspection and test plan, giving you visibility of progress and quality at each stage.
02 — Process
Manufacturing drawings are reviewed and approved before fabrication.
Equipment is built with inspections at agreed stages.
Routine and project-specific tests are carried out and recorded.
Equipment is released for packing once all points are closed.
Deliverables
When it applies
03 — Related
Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.
A project-specific quality plan defining what is checked, when, by whom and against which criteria.