Load Bank Testing
Running generator sets under load at the factory to verify performance, stability and protection.
MFQ-06
The Factory Acceptance Test is the formal demonstration that equipment meets the specification. ASTERON prepares the procedure, witnesses the tests and documents the results — and you are welcome to attend.
01 — Scope
The FAT procedure is written from the project specification and agreed before testing. It typically covers visual and dimensional checks, functional tests of controls and protection, load testing where applicable, and verification of interfaces with other equipment.
Any open points are recorded on a punch list and closed before the equipment is released. Customers or their appointed representatives can witness the tests in person.
02 — Process
We prepare the FAT procedure from the specification.
We confirm the equipment and test facilities are ready.
We witness the tests, with your attendance if desired.
We close open points and release the equipment for shipment.
Deliverables
When it applies
03 — Related
Running generator sets under load at the factory to verify performance, stability and protection.
Packing, documentation and logistics coordination for international delivery under the agreed Incoterms.
Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.
Start with your load
Share what you know about your project — even if some of it is still undecided. Our engineers review every inquiry.
No price lists. Every proposal is engineered to your project.