Factory Acceptance Testing

Factory Acceptance Testing verifies that the equipment performs as specified before it leaves the manufacturer. ASTERON prepares the test procedure, witnesses the tests and records the results.

This service is described in full under Manufacturing & Quality.

Read the full description

01 — Scope

What we do

FAT is the point at which the engineering scope hands over to shipment: functional checks, load testing and control-sequence verification are completed and documented, and you or your representative can attend.

Deliverables

What you receive

    02 — Related

    Continue exploring

    Engineering

    Production Oversight

    Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.

    Manufacturing & Quality

    Load Bank Testing

    Running generator sets under load at the factory to verify performance, stability and protection.

    Start with your load

    Tell us about your load. We’ll engineer the system.

    Share what you know about your project — even if some of it is still undecided. Our engineers review every inquiry.

    No price lists. Every proposal is engineered to your project.