Production Oversight
Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.
ENG-09
Factory Acceptance Testing verifies that the equipment performs as specified before it leaves the manufacturer. ASTERON prepares the test procedure, witnesses the tests and records the results.
This service is described in full under Manufacturing & Quality.
Read the full description01 — Scope
FAT is the point at which the engineering scope hands over to shipment: functional checks, load testing and control-sequence verification are completed and documented, and you or your representative can attend.
Deliverables
02 — Related
Following the equipment through manufacture, with inspections at defined stages and prompt resolution of deviations.
Running generator sets under load at the factory to verify performance, stability and protection.