Factory Acceptance Testing
Formal, witnessed testing of equipment against the specification before it is released for shipment.
MFQ-05
A generator set should carry load before it is shipped. Load bank testing shows how it performs — steady state, step changes and protective functions.
01 — Scope
The set is run against a load bank through a defined sequence of load steps. Electrical output, transient response, temperatures and pressures are recorded, and protective and control functions are checked.
For multi-unit plants, synchronising and load sharing between sets can be demonstrated where the test facility allows.
02 — Process
We define the test sequence and acceptance criteria.
The set is run through the agreed load steps.
Performance data and observations are recorded.
Results are reviewed and the test report is issued.
Deliverables
When it applies
03 — Related
Formal, witnessed testing of equipment against the specification before it is released for shipment.
A project-specific quality plan defining what is checked, when, by whom and against which criteria.
Start with your load
Share what you know about your project — even if some of it is still undecided. Our engineers review every inquiry.
No price lists. Every proposal is engineered to your project.